Balloon Chat
Uncategorized Boards => Balloon Chit Chat => Topic started by: Graham Lee on April 30, 2018, 08:51:57 AM
It's usually big build Friday but David has a job in for tomorrow.
Not so much a big build but lots of small things to build in a day.
Will post a few pictures when we get time later.
All done, twisted from 9am till around 7.30pm. Will start posting a few pictures later,
it was for a shop opening in London tomorrow that David will be attending.
A few from today.
The start of the boom box for the DJ booth.
The jelly fish.
David taking calls and multi tasking.
The boom box coming together.
The boom box coming on and the flamingo's as per client instructions.
A variation on the Pieter van Engen design.
More of the same.
Some shells and a banana.
Onto the cacti.
This is the last of the pictures I took but David sent me some
of the shop all decorated so will add those as well.
Some pictures from the shop.
David took these on his phone.
The boom box ix over 3 metres wide.
This is the last of the pictures that we have.
We are hoping the official photographer will send us a few over shortly though,
fingers crossed.